Share the Experience and Exchange Ideas
German | French | Portugese | Italian


 
Software Testing
 
  • Testing Forum
  • Introduction
  • Testing Start Process
  • Testing Stop Process
  • Testing Strategy
  • Testing Plan
  • Risk Analysis
  • Software Testing Life Cycle
  • Test Management
  • A-Z Knowledge
  • Software Listings
  •  
    Software Testing Types
     
  • Static Testing
  • Dynamic Testing
  • Blackbox Testing
  • Whitebox Testing.
  • Unit Testing.
  • Requirements Testing.
  • Regression Testing.
  • Error Handling Testing.
  • Manual support Testing.
  • Intersystem Testing.
  • Control Testing.
  • Parallel Testing.
  • Volume Testing.
  • Stress Testing.
  • Performance Testing.
  •  
    Testing Tools
     
  • Win Runner
  • Load Runner
  • Test Director
  • Silk Test
  • Test Partner
  •  
    Interview Question
     
  • Win Runner
  • Load Runner
  • Silk Test
  • Test Director
  • General Testing Question
  •  
    Resources
     
  • Testing Forum
  • Downloads
  • E-Books
  • Jobs
  • Testing Interview Questions
  • Testing Tools Questions
  •    
     

    Testing Stop Process



     
    When to Stop Testing

    This can be difficult to determine. Many modern software applications are so complex, and run in such as interdependent environment, that complete testing can never be done. "When to stop testing" is one of the most difficult questions to a test engineer. Common factors in deciding when to stop are:

    • Deadlines ( release deadlines,testing deadlines.)
    • Test cases completed with certain percentages passed
    • Test budget depleted
    • Coverage of code/functionality/requirements reaches a specified point
    • The rate at which Bugs can be found is too small
    • Beta or Alpha Testing period ends
    • The risk in the project is under acceptable limit.

    Practically, we feel that the decision of stopping testing is based on the level of the risk acceptable to the management. As testing is a never ending process we can never assume that 100 % testing has been done, we can only minimize the risk of shipping the product to client with X testing done. The risk can be measured by Risk analysis but for small duration / low budget / low resources project, risk can be deduced by simply: -

    • Measuring Test Coverage.
    • Number of test cycles.
    • Number of high priority bugs.


    Recommended Resources
    • Testing Interview Questions - http://www.coolinterview.com/type.asp
    • Testing Tools Interview Questions - http://www.coolinterview.com/type.asp
    • What is Software Testing?- http://en.wikipedia.org/wiki/Software_testing
    • Software QA & Testing Resource Center- http://www.softwareqatest.com/
    • Testing Faqs- http://www.testingfaqs.org/

    Get Free Software Testing eBook when you join One Stop Testing!
    A D V E R T I S E M E N T

     

     

     

       
    A D V E R T I S E M E N T

       


    Home | Forum | Contact Us | Sitemap

    Vyom Network : Free SMS, GRE, GMAT, MBA | Online Exams | Freshers Jobs | Software Downloads | Programming & Source Codes | Free eBooks | Job Interview Questions | Free Tutorials | Jokes, Songs, Fun | Free Classifieds | Free Recipes | Bangalore Info | GATE Preparation | MBA Preparation | SAP Info
    Sitemap | Sitemap (XML)

    The site is maintained by Vyom Technosoft Pvt. Ltd.
    Job Interview Questions | Placement Papers | SMS Jokes | C++ Interview Questions | C Interview Questions