Key Challenges of s/w testing: 1. Testing considered late in project 2. Requirements not testable 3. Integration is done after all components have been developed: This might result into full testing not being covered. 4. Complete testing is not possible
Key Challenges of s/w testing:
1. Testing considered late in project
2. Requirements not testable
3. Integration is done after all components have been developed: This might result into full testing not being covered.
4. Complete testing is not possible
Give me some example for high severity and low priority defect?
What is meant by Priority and severity?
What is the Diff between Two Tier & Three tier Architecture?
What is the diff between Volume & Load?
.What is Severity and Priority and who will decide what?
Why do you go for Test Bed?
How can it be known when to stop testing?
What�s a �test case�?
What�s the big deal about �requirements�?
What makes a good Software QA engineer?