Key Challenges of s/w testing: 1. Testing considered late in project 2. Requirements not testable 3. Integration is done after all components have been developed: This might result into full testing not being covered. 4. Complete testing is not possible
Key Challenges of s/w testing:
1. Testing considered late in project
2. Requirements not testable
3. Integration is done after all components have been developed: This might result into full testing not being covered.
4. Complete testing is not possible
Why are there so many software bugs?
Give me five solutions to problems that occur during software development
What makes a good test engineer?
What is Software requirements?
What is a test plan?
What is a test case?
What should be done after a bug is found?
What is configuration management?
What if the software is so buggy it can�t be tested at all?
What if the project isn�t big enough to justify extensive testing?